Major Infrastructure Projects
Whether it is delivering a million dollar mining electrical infrastructure
upgrade in Queensland's Bowen Basin or a full plant Automation project
in Brisbane's inner city, i.power solutions' in-house multi-disciplinary
team of engineers (electrical, civil, structural, mechanical, control
and automation), site services staff, and in-house manufacturing team
have the capability to deliver world class solutions to metropolitan
and remote locations and deliver on commercial fronts.
A turnkey solution, as offered by i.power solutions Pty Ltd, will address
a project's entire scope of works including civil engineering, electrical
engineering, procurement, design and manufacture, installation and commissioning.
"Extended warranty", "service contract" and "handover
agreements" usually form part of these contracts.
Delivery is from concept to completion. Working together with a client,
we are able specify the work to be completed, do the design, manufacture
the product, develop and supply software, install, test and commission
the final product. There are few companies in the world, able to demonstrate
such capability and flexibility in this role.
Some of i.power solutions' previous projects include:
- Isis
Sugar Mill Infrastructure Upgrade - Isis, Queensland
- Isis
Milling Train Electrification
- Isis, Queensland
- Crinum East
Mine Mine Infrastructure Upgrade - Bowen Basin, Queensland
- Mt Arthur North
Mine Wide Control System - Muswellbrook, New South Wales
- Jupiter Power
C1 Power Station Upgrade - Jupiter Power, Cambodia
- Bundaberg Sugar
No.5 Crushing Mill Electrics - Proserpine, Queensland
- Bundaberg Sugar
Tableland Sugar Mill Electrics - Bundaberg, Queensland
- Mill Permanent
Water Systems Electrics - OK Tedi Mine, Papua New Guinea
Prefabricated Switchyards
i.power solutions’
prefabricated switchyards and substations allow the customer to install
a completely operational substation for temporary or permanant use.
Any change in power requirements can be met by relocating the substation
without having to build an entirely new installation. The switchyard
and substation are incorporated into steel bases which eliminate the
need for permanent and costly installations. All assemblies are factory
assembled and tested before delivery, thereby reducing on-site commissioning
to a minimum.
Download Transportable
Switchrooms
Downlaod Hail
Creek 132KV Substation
Download
Newlands 66-11KV Substation